Complex Ballast Tank Upgradation & CAP 1 Certification

Case Study: Project 01

A Strategic Maritime Engineering Intervention executed Over a 4-month continuous Voyage deployment

CLIENT

Leading Global Fleet Operator

DURATION

95 Execution Days 

The Commercial Challenge

Extending the commercial viability of an aging, 20-year-old MR Tanker requires rigorous coating maintenance to secure CAP 1 certification. Aquanav was tasked with executing this critical upgradation inside the highly complex, confined structures of the Forepeak Tank (FPK) and Water Ballast Tanks (WBT 6 Port & Starboard) without extending the vessel's planned operational downtime.

hydroblasting editorial edited.png

OPERATIONAL PRECISION

Execution and technical standards

OPERATIONAL PRECISION

Execution and technical standards

"By seamlessly adapting our operations around active port schedules and weather, we ensured zero off-hire disruption."

strategy

5-Man specialized riding squad deployed for continuous service execution.

water-drop-icon-blue.png

UHP Blasters

1050 Bar (WJ2) hydro blasting, fully ISO 8501-4 compliant.

verification-badge-blue.png

Grade WJ 2

Achieved optimal surface preparation using FW hydroblasting, followed by edge feathering and surface roughening by power tools to ST2/ST3 standard

Ballast tank bristle blasting edited.png
bristle blasting

Minimum Sa 1 (ISO 8501-1) profile across all spot-blasted zones for superior adhesion.

verification

Strict adherence to international benchmarks for long-term coating integrity.

Abstract Ocean Waves

Coating and Application Verification

APPLICATION AND MATERIALS

Following rigorous surface preparation, the team executed a high-performance, two-coat system utilizing airless spray applications. We utilized the premium Jotun Balloxy HB system in alternating Dark and Light coats to ensure complete coverage and thickness verification.

Ballast tank spray painting edited.png

DRY FILM THICKNESS (DFT) VERIFICATION

Mandated Target            250 µm

Actual Achieved.       251-376 µm

MATERIAL VOLUME CONSUMED

Jotun Balloxy Lt. Beige      740 Litres

Jotun Balloxy Lt. Green     880 Litres

Thinner No. 17.                       80 Litres

The Aquanav Advantage

Innovation

Proprietary Deployment: Vertomech Rigging

A cornerstone of this project's success was the implementation of our proprietary Vertomech rigging system. By eliminating the need for traditional, time-consuming scaffolding inside the tanks, we significantly reduced preparation time and increased safety for our riding squad. This streamlined approach was instrumental in maintaining the vessel's tight operational schedule while achieving the rigorous standards required for CAP 1 certification.

Ballast tank hydroblasting edited.png

Zero Scaffolding.
Zero Downtime.

CAP 1 Certification Secured

project completion

Our precision execution ensured the vessel's commercial viability was extended without a single day of operational downtime.